Case Studies

Winning customer’s trust by delivering on our promise of meeting the agreed expectations every time, first time.

Park Hyatt Hotel

Lighting Control System

  • 800+ Intelligent Smart Sensors

    Almost 15,000 Lights are controlled with this smart sensors

  • 36 Timer Control

    Complete 36 levels are controlled by timer with predefine scenes as per client

  • DMX Landscape Lights

    All DMX & Landscape are controlled by timer and Photocell

GRMS System

  • 187 Total Number of Hotel rooms

    Almost 1,400+ keypads are used to control lighting and Curtain

  • iPad - Customized iPad Graphics

    iPad user interface for controlling complete lighting, FCU & curtain in guest room

  • 1,400+ Customized Switch Panel

    Customized touch panel for lighting, FCU and Curtain Control.
    Customized FCU control Panel.
    Integrations With BMS, PMS & Access Control System.

Video Intercom System – 14 Buildings

  • 92 Total Number of Outdoor Units

    Almost 92 outdoor Units & 16 Concierge stations

  • 13 Servers

    Server for Each Building

  • 361 VIS integrated with SHS

    Crestron Touch Panel is used for the VIS answering station

  • 30+ Doors - Integration with ACS

    VIS system integrated with ACS for the Door release from the Receiving station & Concierge Unit

  • 361 Apartments - Integration with CMS

    Offline Alarms and system status is integrated to CMS

Structured Cabling System – 15 Buildings

  • 536+ IDT Rooms

    Almost 26,000+ Voice & Data Points has been installed & Tested successfully

  • 15,000+ Meters Fiber Optic Cabling

    6 Core & 12 Core Single mode & Multi Mode Fiber Cable has been laid and tested successfully

Integrated Reception System – 14 Buildings

  • 361 Apartment IRS

    Optical Fiber Backbone with splitter has been installed & Tested successfully

  • 361 Multi switch & Optical Converter

    4 Core single mode fiber & Coaxial Cable has been terminated and tested successfully

Audio Video System – 14 Buildings

  • 361 Apartment AV

    HDMI with splitter has been installed & Tested successfully

  • 1 Mosque AV

    Completed AV system for Mosque has been installed and tested successfully